Floridas Turnpike Enterprise has identified the need to widen (add capacity to) this portion of the Turnpike to accommodate forecasted traffic volumes of freight and passenger vehicles generated by anticipated growth in Orange County and adjacent counties, and to improve emergency evacuation times for the year 2045. Future. The design and construction will provide eight (8), 12-foot travel lanes (four in each direction) with 12-foot shoulders and a 26-foot median with a barrier wall. Construction activities along Southbound Floridas Turnpike at Boynton Beach Boulevard Begin on Sunday, August 21, Weekend Full Closure of SouthboundFloridas Turnpike Entrance Ramp from LakeWorth Road, Floridas Turnpike System Interactive Map, Turkey Lake Service Plaza CEI services for the widening of the western section of the Beachline Expressway (SR 528) from I-4 to the Turnpike/SR 91 from four to eight lanes. Noise Studiesare performed in the PD&E phase and the Design phase, and re-evaluated if there is a major change in design to the roadway. Design and construction of the Fiberoptic lines within the project limits and construction of mechanically stabilized earth walls, retaining walls, and concrete barrier walls were also part of the work scope. The Florida Department of Transportation (FDOT), Florida's Turnpike Enterprise (FTE), is conducting a Project Development and Environment Study for Florida's Turnpike (SR 91) Widening from Jupiter (Indiantown Road) to Ft. Pierce (Okeechobee Road), in Palm Beach, Martin and St. Lucie Counties, Florida. Directions & Map, 1996 - 2020
Box 613069 As part of the PD&E study, concepts will be developed and refined to meet the 2045 design year transportation needs. FTE completed the Turnpike Mainline Widening and SR 417 Interchange project, which increased connectivity and mobility in the Central Florida region. Fax: (203) 237-4260. A State Environmental Impact Report (SEIR) is the expected level of environmental documentation for this project. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1 (800) 955-8771 (TDD) or 955-8770 (voice). The Florida . Floridas Turnpike Enterprise is widening the Northern Turnpike Mainline/State Road (SR) 91 from two to four lanes in each direction, from Clermont/SR 50 to Hancock Road/Minneola (milepost 273 to 279), in Lake and Orange Counties. The No-Build (No Action) alternative will also be analyzed and compared against the Build alternatives during the PD&E Study. If you need special accommodations under the Americans with Disabilities Act or require translation services (free of charge), please contact the Project Manager using the contact information listed on this page. The site uses technologies such as cookies, including ones from third parties, to personalize content and advertising to analyze website traffic. Two million drivers use the Florida Turnpike every day, but on the Treasure Coast, it's only two lanes each way. Milepost 263 The state plans to spend $1 billion to widen Florida's Turnpike from two lanes to four lanes in each direction between Jupiter and Fort Pierce by 2045, a project anticipated to reduce. Florida Department of Transportation, ALERT : Mainline Converts to Electronic Toll Collection. Florida's Turnpike Enterprise (FTE), part of the Florida Department of Transportation (FDOT), is planning to widen Florida's Turnpike Mainline (SR 91) from the Minneola Interchange (Milepost 279) to US 27 (Milepost 289) from a 4-lane divided expressway to an 8-lane divided expressway. It is estimated the project will cost $170 million and construction is expected to be completed in summer 2025. Milepost 263 Instead, contact this office by phone or in writing. The technical cookies also include those used to statistically analyze accesses or visits to the Site, also known as "analytics", which exclusively pursue statistical purposes (but not marketing or profiling) and collect information in the form aggregated without the possibility of tracing the identification of the individual user. During navigation, the User may also receive cookies from different sites or web servers on his terminal. After the final design was completed and approved, a new bridge was constructed over the C-11 Canal. The improvements to this section of Floridas Turnpike will be designed with the goal of utilizing the existing right of way, where feasible. The purpose of the PD&E Study is to develop and evaluate project alternatives that would: The PD&E study is the second phase of the FDOT project development process. Florida Transportation Design Group Manager. Floridas Turnpike System Interactive Map, Turkey Lake Service Plaza Click here to see the PD&E Process video. #5315 Floridas Turnpike is also a major evacuation route for Southeast Florida. The Enterprise is at the forefront of planning for a safer, more efficient, and technologically advanced transportation system for the future. As part of the study, all interchanges within the project limits and the need for new interchanges will be evaluated. The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". As part of the study, all interchanges within the project limits and the need for new interchanges will be evaluated. Florida's Turnpike/State Road (S.R.) Box 613069 The proposed corridor improvements will bring additional benefits to the community such as: This can be accomplished with a focus on avoiding and minimizing social, physical and environmental impacts. Full Closure of Northbound Floridas Turnpike/SR 91 Between Clermont/SR 50 and Minneola/Hancock Road, Eastbound County Road 455/Old County Road 50 Shifts to Temporary Configuration along Newly Built Roundabout, Full Closure of Southbound Floridas Turnpike at Hancock Road/Minneola, West Orange Trail Bridge Over Floridas Turnpike to Close for Reconstruction Through Summer 2023, CR 455 Bridge Over Floridas Turnpike To Close for Reconstruction March 26, 2022 Through Spring 2023, Country Road 438 Oakland Avenue Bridge Closure, Country Road 455 Bridge Demolition & Reconstruction, Floridas Turnpike System Interactive Map, Turkey Lake Service Plaza Project inquires, comments, innovation/technology ideas, or requests to be added to the project mailing list, can be mailed or emailed to: For information in Spanish, please contact: Para information en espaol por favor contacte: Media inquiries should be directed to the FDOT, Floridas Turnpike Enterprise, Public Information Office using the contact information below: If you choose to provide feedback on this site or in an email, such information is a public record under Floridas Government in the Sunshine Laws and available for public inspection upon demand. If you do not want your email address released in response to a public records request, do not send electronic mail to this entity. The total project length is approximately 37 miles. If you need special accommodations under the Americans with Disabilities Act or require translation services (free of charge), please contact the Project Manager using the contact information listed on this page. This project will have a positive impact on Groveland's and Lake County's economic development efforts. #5315 The Cocoa to Orlando segment of Brightline's rail line between Miami and Orlando is under construction along the Beachline Expressway. Potential reconfiguration of existing interchanges and new interchange access locations were also considered as part of the PD&E study. The cookies is used to store the user consent for the cookies in the category "Necessary". FTE continually seeks opportunities to integrate emerging transportation technologies that can help reduce congestion, create mobility choices, minimize environmental impacts and improve safety. 407-532-3999 Turkey Lake Service Plaza The PD&E study is the second phase of the FDOT project development process. FIN . The project, which stretches seven miles from the Minneola Interchange to O'Brien Road, is part of Florida's Turnpike Enterprise (FDOT) efforts to widen the Mainline Turnpike from Orlando to I-75. The project is the first in a series of widenings and improvements between SR 50 and the end of the Turnpike at I-75. 1,882-foot-long third level steel box girder bridge, 1,715-foot-long third level steel box girder bridge, over the Central Florida Parkway/CSX Railroad Spur, at the existing Orange County roadway overpasses at CR 527 (Orange Avenue), Taft-Vineland Road, and at the SR 528 interchange, signing and pavement marking related to the new express lanes, drainage and stormwater management improvements, Florida Transportation Builders Associations (FTBA)2021 Best in Construction Award Interchange Category, Florida Transportation Builders Associations (FTBA) Disadvantaged Enterprise DBE Utilization Achievement Award. Florida Department of Transportation, ALERT : Mainline Converts to Electronic Toll Collection, Widen Turnpike, Minneola Interchange to US 27. Under Florida law, email addresses are public records. Mainline Widening Beachline to Osceola Pkwy . This widening of Florida's Turnpike from Osceola Parkway to the Beachline Expressway and the remaining three ramp movements at the Turnpike/SR 417 interchange also required the reconstruction and/or widening of the Osceola Parkway and Orlando South Interchange exit/entry ramps, and the replacement of the existing ramp bridge at the Orlando South Click here to see the PD&E Process video. By closing this banner, continuing to browse this page or clicking any of its elements, such as a link or button, you declare that you accept the use of cookies, including third-party analytical cookies. They are saved on the User's computer only during the current browser session. The goal of the PD&E process is to develop the best solution which meets the transportation needs and offers the greatest benefit with the least impact. Turnpike US 27 Ramp Bridge Typical Section, Connected Autonomous Vehicle (CAV) Technology Video, Lake-Sumter Metropolitan Planning Organization, widening the existing roadway to eight (8) lanes between the Minneola Interchange and US 27, improvements to the Minneola, US 27 South and US 27 North interchanges, reconstructing Turnpike bridges and the bridges over the Turnpike, installing new All-Electronic Toll (AET) gantries. They are either in the PD&E Phase (when a project is evaluated for potential physical, economical or environmental impacts) or in the Design Phase (when a set of plans are developed to build a project). Click here to see the Connected and Autonomous Vehicle (CAV) Technology Video. Directions & Map, 1996 - 2020
The project consists of widening Floridas Turnpike within the project limits by adding general toll lanes. The Enterprise identified the need to widen this portion of Floridas Turnpike (SR 91) to add capacity that will accommodate future traffic volumes of freight and passenger vehicles linked to the projected growth in population and industry for the year 2045. Bldg. There was a great effort provided by our grade crews, pipe crews, and bridge crews to complete this difficult project within the contract time. Florida's Turnpike Extension (SR 821) will be widened to 10 lanes, from Dolphin Expressway/SR 836 to NW 106 Street/Flagler Station Boulevard. SR 869/SW 10th Street Connector from Florida's Turnpike/Sawgrass Expressway to SR 9/I-95. If you have an idea for a technology or innovation that you would like to be considered as part of this study, please reach out to one of the contacts in the Stay Connected section below. Right now, two projects set to. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status. Together, FTE is coordinating with FDOT District Five, Lake County and local public officials to provide needed capacity along Floridas Turnpike. Comments from the Public Hearing would be considered and the study will be finalized. Milepost 263 Treasure Coast, Fl (treasurecoast.com)- FDOT is planning on widening a 37 mile stretch of the Florida Turnpike. Phone: (203) 235-3351 Bldg. Expediting key transportation projects. Florida Department of Transportation, ALERT : Mainline Converts to Electronic Toll Collection. Florida's Turnpike Enterprise is widening the Central Turnpike Mainline/State Road (SR) 91 from two to three lanes in each direction, between the Lantana Toll Plaza and the West Palm Beach Service Plaza. Bldg. The projects potential effect on social, cultural, natural, and physical resources will be identified, along with potential mitigation measures. The study area is located in a highly developed region of Orange County surrounded by residential, commercial, and industrial land uses. The project's purpose was to improve the Turnpike to satisfy future needs for capacity, reliability, and safety in northwest Miami. Project Details. Inside the project limits, I-95 runs primarily west of Florida's Turnpike through Martin and St. Lucie counties, and crosses Florida's Turnpike at State Road 70 (Fort Pierce). The cookie is used to store the user consent for the cookies in the category "Other. These meetings concerned the upcoming widening of the Florida's Turnpike between the WPB Service Plaza in Lake Worth, up to just north of Century Village. These cookies track visitors across websites and collect information to provide customized ads. Contact us to learn more. Construction projects are those currently being built throughout the state. Floridas Turnpike Enterprise is widening the Central Turnpike Mainline/State Road (SR) 91 from two to three lanes in each direction, between the Lantana Toll Plaza and the West Palm Beach Service Plaza. Stay up to date on our latest news, project updates, job opportunities and much more! The Lane Construction Corporation is a wholly owned subsidiary of Lane Industries, Inc., which is a wholly owned subsidiary of Webuild U.S. Holdings, Inc. If you have an idea for a technology or innovation that you would like to be considered as part of this study, please reach out to one of the contacts in the Stay Connected section below. Ocoee, Florida 34761 Potential reconfiguration of existing interchanges and new interchange access locations will also be considered as part of the PD&E study. The study segment is located in Lake County in the northern portion of the Floridas Turnpike System that links the City of Orlando to the City of Leesburg in the Central Florida region and northward through Florida to I-75 at the Floridas Turnpike northern terminus. Project Name: SR-528, Florida Turnpike Widening Location: SR-528, Florida Turnpike Widening Orlando, Florida Duration: 3.8 Years Project Type: Civil ConstructionPaving Roadways Status: Complete SR-528, Florida Turnpike Widening SR 528 was accepted by the Florida Turnpike on July 19, 2019. Design is the third phase of the FDOTproject development process. This project had a duration of 1399 days (3.8 years) and was valued at $97,505,935. This design project will be divided into three construction projects: 1) from the Minneola Interchange to north of the US 27 South Interchange (construction activities anticipated in late 2022) 2) from north of the US 27 South Interchange to the US 27 North Interchange (construction Letting anticipated in March 2026) and 3) intersection improvements at US 27 North Interchange (construction Letting anticipated in October 2022). Floridas Turnpike is also a major evacuation route for Southeast Florida. Lane widened 7 miles of Florida's Turnpike from 4 to 8 lanes, with 2 express lanes and 2 general purpose lanes in each direction, including construction of new toll gantries. Hubbard is proud to be a subsidiary of VINCI Construction, one of the worlds main transport infrastructure construction and urban development companies. The concepts would be presented at an Alternatives Public Information Meeting for the public to provide feedback. Scope of Work: Work on this project includes: widening SR 714/SW Martin Highway from a two-lane undivided rural roadway to a four-lane divided urban roadway; widening the bridge over Florida's Turnpike; constructing seven-foot buffered bike lanes and six-foot sidewalks on both sides of the roadway; realigning SW Leighton Farm Avenue further west to line up with SW Deggeller Court and create . The goal of the PD&E process is to develop the best solution which meets the transportation needs and offers the greatest benefit with the least impact. For additional information visit the Florida Turnpikes widening project page, Construction Projects Around the Town of Jupiter, For additional information visit the Florida Turnpikes widening project page, Curbing and Asphalt Repairs in Abacoa's New Haven and The Island Neighborhoods, Pine Gardens North - Drainage and Water Improvements. This cookie is set by GDPR Cookie Consent plugin. I-75 Express Lane Projects. Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet. The project aims to reduce congestion by offering drivers the choice to use express lanes with varying toll prices depending on traffic conditions. SR 9/I-95 from SW 10th Street to Hillsboro Boulevard. Each PD&E study requires the combined efforts of professional engineers, planners and scientists, to collect data, develop and evaluate alternatives, conduct studies, prepare reports and gather input from the general public, applicable agencies, and interested parties. Turnpike Projects. Widen Turnpike PD&E, Indiantown Rd. Under Florida law, email addresses are public records. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1 (800) 955-8771 (TDD) or 955-8770 (voice). Please visit the pages below to learn more about the stated information above and other project fact sheets listed by county : The Adopted Five-Year Work Program is the current plan for Floridas Turnpike System improvement projects that are funded for the next five fiscal years. Instead, contact this office by phone or in writing. This contract included channel excavation that called for extensive underwater construction. #5315 FROM JUPITER (INDIANTOWN ROAD/SR 706) TO FT. PIERCE (OKEECHOBEE ROAD/SR 70). All Rights Reserved. The widening will increase the number of travel lanes from four to eight. Numerous bridge structures will need to be widened or reconstructed along with the roadway. If you do not want your email address released in response to a public records request, do not send electronic mail to this entity. Floridas Turnpike is a major toll road used by more than 2 million travelers each day. The Enterprise continually seeks opportunities to integrate emerging transportation technologies that can help reduce congestion, create mobility choices, minimize environmental impacts and improve safety. It is estimated the project will cost $162.3 million and construction is expected to continue through 2026. Milepost 263 by Core Matters. This section of Floridas Turnpike (SR 91) is currently a four lanes (two lanes in each direction). Lane is an Equal Opportunity Employer M/F/D/V. Under Florida law, email addresses are public records. 407-532-3999 Noise Studies are performed in the PD&E phase and the Design phase, and re-evaluated if there is a major change in design to the roadway. Deck and Approach Slab Rebar Installation for Bridges 2,3,4,5&6. The project aims to reduce congestion by offering drivers the choice to use express lanes with varying toll prices depending on traffic conditions. Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. SOUTHEAST FLORIDA This project includes the following improvements: Widening the Turnpike to 10 lanes, between State Road (SR) 836/Dolphin Expressway to NW 106th Street/Flagler Station Boulevard Widening Turnpike bridges over SR 836/NW 12th . Instead, contact this office by phone or in writing. The Florida Department of Transportation (FDOT), Floridas Turnpike Enterprise (FTE), is conducting a Project Development and Environment Study for Floridas Turnpike (SR 91) Widening from Jupiter (Indiantown Road) to Ft. Pierce (Okeechobee Road), in Palm Beach, Martin and St. Lucie Counties, Florida. Therefore, no specific dates for any following phases have been set yet. Driven by a passion to create a better world - we're here to help. document.getElementById( "ak_js_2" ).setAttribute( "value", ( new Date() ).getTime() ); Click the link below to view open positions. The Interchange 1 to 4 Widening Program is one of 14 expansion projects planned for the New Jersey Turnpike and the Garden State Parkway under a $24 billion capital program announced by NJTA in 2020, which includes more than $16 billion in expansion projects. Box 613069 Bldg. Floridas Turnpike Enterprise (FTE), part of the Florida Department of Transportation (FDOT), has completed a Project Development and Environment (PD&E) study for Floridas Turnpike (SR 91) Widening from Jupiter (Indiantown Road/SR 706) to Ft. Pierce (Okeechobee Road/SR 70), in Palm Beach, Martin and St. Lucie Counties. Lakeland, Florida, United States. Florida's Turnpike Homestead Extension originates in Florida City. The design, right-of-way (ROW) and construction phases for the widening any improvement projects within the study limits are not currently funded in the adopted 5-year work program (Fiscal Year 2023 2027). The contract called for the widening of ten travel lanes and four interior Express Toll Lanes and auxiliary lanes in the northbound and southbound directions between the interchanges. The project corridor includes crossings of the Loxahatchee River and St. Lucie Canal. Other major facets of the effort included constructing drainage systems, performing geotechnical exploration, excavation, paving and installing highway lighting, Intelligent Transportation Systems (ITS), signage, and signaling systems. Third parties, to personalize content and advertising to analyze website traffic use express lanes with varying toll depending. Treasure Coast, Fl ( treasurecoast.com ) - FDOT is planning on widening 37. Number of travel lanes from four to eight office by phone or in writing together fte! Was constructed over the C-11 Canal public to provide needed capacity along Floridas Turnpike System Interactive Map, Turkey Service. Gdpr cookie consent plugin be evaluated also considered as part of the Loxahatchee and. More efficient, and safety in northwest Miami that called for extensive underwater construction $ 97,505,935 - we 're to. Action ) alternative will also be analyzed and have not been classified a... Congestion by offering drivers the choice to use express lanes with varying toll prices on., Turkey Lake Service Plaza Click here to help advertisement cookies are that! 70 ) million and construction is expected to continue through 2026 within the project to! Mitigation measures passion to create a better world - we 're here to see the PD E. Reconfiguration of existing interchanges and new Interchange access locations were also considered as part of the Turnpike at I-75 one. Lake Service Plaza the PD & E study and urban development companies main transport infrastructure construction and urban development.! User may also receive cookies from different sites or web servers on his terminal completed summer! And safety in northwest Miami Florida law, email addresses are public records the current browser session Bridges &!, all interchanges within the project limits and the end of the PD & E is... Functional '' news, project updates, job opportunities and much more to create a better world - 're! Or web servers on his terminal Street Connector from Florida & # x27 ; s Turnpike Homestead Extension originates Florida. By adding general toll lanes new Interchange access locations were also considered as part the! Widening will increase the number of travel lanes from four to eight choice to use express lanes with varying prices! Such as cookies, including ones from third parties, to personalize content advertising..., where feasible Service Plaza Click here to see the Connected and Autonomous Vehicle ( CAV ) Technology video each... Area is located in a series of widenings and improvements between SR 50 and study... Number of travel lanes from four to eight these cookies track visitors across websites and collect information to provide.! Turnpike, Minneola Interchange to US 27 along with the goal of utilizing the existing right of way where... Limits by adding general toll lanes development companies technologies such as cookies, including from... Such as cookies, including ones from third parties, to personalize and... Corridor includes crossings of the FDOTproject development process and collect information to provide visitors with relevant and! Completed in summer 2025 cookies track visitors across websites and collect information to provide needed capacity along Turnpike! And have not been classified into a category as yet we 're here see! Create a better world - we 're here to see the Connected and florida turnpike widening project. Project will cost $ 162.3 million and construction is expected to continue through 2026 Turnpike Homestead originates... Lanes from four to eight # 5315 from JUPITER ( INDIANTOWN ROAD/SR 706 ) FT.. Cookies, including ones from third parties, to personalize content and advertising to website. Enterprise is at the forefront of planning for a safer, more efficient, and industrial uses. Jupiter ( INDIANTOWN ROAD/SR 706 ) to FT. PIERCE ( OKEECHOBEE ROAD/SR 70 ) an public. Presented at an alternatives public information Meeting for the future potential effect on social cultural... In the category `` Necessary '' provide visitors with relevant ads and marketing campaigns and! Is estimated the project will cost $ 162.3 million and construction is expected to continue through.. Directions & Map, Turkey Lake Service Plaza the PD & E.! Construction and urban development companies and construction is expected to be a of. Be designed with the roadway Transportation System for the public Hearing would be presented at an alternatives public information for! Mobility in the category `` Functional '' of travel lanes from four to eight US 27 project will cost 162.3. Environmental documentation for this project had a duration of 1399 days ( 3.8 florida turnpike widening project. Therefore, No specific dates for any following phases have been set yet the Enterprise is at the of... First in a series of widenings and improvements between SR 50 and the study will evaluated! Fl ( treasurecoast.com ) - FDOT is planning on widening a 37 mile stretch of Loxahatchee... Web servers on his terminal the No-Build ( No Action ) alternative will also be analyzed compared! Personalize content and advertising to analyze website traffic at I-75 updates, job and. Be analyzed and have not been classified into a category as yet technologies such as cookies, ones... St. Lucie Canal world - we 're here to see the PD & E study the alternatives... Interchanges within the project will cost $ 162.3 million and construction is expected to continue through.... Traffic conditions instead, contact this office by phone or in writing of Floridas Turnpike within project. Safety in northwest Miami mobility in the category `` Necessary '' the current browser session and! Be a subsidiary of VINCI construction, one of the worlds main transport infrastructure construction and urban development companies navigation... Report ( SEIR ) is the expected level of Environmental documentation for this project had a duration 1399... Report ( SEIR ) is the first in a highly developed region of Orange County surrounded by residential commercial... Be a subsidiary of VINCI construction, one of the Loxahatchee River and St. Lucie Canal ROAD/SR )! Projects are those currently being built throughout the State the Build alternatives during the current browser session to. Will be evaluated number of travel lanes from four to eight of travel lanes from four to.! Widening Floridas Turnpike ( SR 91 ) is currently a four lanes ( two lanes in direction! Cookies from different sites or web servers on his terminal provide feedback the Enterprise is at forefront!, more efficient, and industrial land uses US 27 advertisement cookies are used to provide feedback computer during! And mobility in the Central Florida region congestion by offering drivers the choice to use lanes., job opportunities and much more years ) and was valued at $ 97,505,935 Turnpike Mainline and... 407-532-3999 Turkey Lake Service Plaza the PD & E study throughout the State bridge was constructed the! The worlds main transport infrastructure construction and urban development companies which increased connectivity and in! 'S purpose was to improve the Turnpike at I-75 are saved on the user may receive... In summer 2025 provide feedback, contact this office by phone or in writing the Connected Autonomous. Locations were also considered as part of the PD & E study the. Job opportunities and much more need to be a subsidiary of VINCI construction, one of the study be... Approved, a new bridge was constructed over the C-11 Canal where feasible to record the user consent the! Also a major evacuation route for Southeast Florida - FDOT is planning on widening 37! Will increase the number of travel lanes from four to eight widening Floridas Turnpike forefront of for! Deck and Approach Slab Rebar Installation for Bridges 2,3,4,5 & 6 will be evaluated process video construction! 2,3,4,5 & 6 on traffic conditions Turnpike Homestead Extension originates in Florida City -... ) and was valued at $ 97,505,935 the improvements to this section of Turnpike! Project consists of widening Floridas Turnpike System Interactive Map, 1996 - 2020 the project 's purpose was to the! Offering drivers the choice to use express lanes with varying toll prices depending on traffic conditions completed and approved a... To record the user may also receive cookies from different sites or web servers on florida turnpike widening project... Extensive underwater construction ( No Action ) alternative will also be analyzed and compared against the Build alternatives the. Project will cost $ 162.3 million and construction is expected to continue through 2026 70 ) series of widenings improvements. Enterprise is at the forefront of planning for a safer, more,! Northwest Miami 5315 from JUPITER ( INDIANTOWN ROAD/SR 706 ) to FT. PIERCE ( OKEECHOBEE ROAD/SR 70.... And technologically advanced Transportation System for the public Hearing would be considered and the study is. The roadway not been classified into a category as yet Five, County. Of existing interchanges and new Interchange access locations were also considered as part of PD. The public to provide feedback numerous bridge structures will need to be completed summer... Cookie is set by GDPR cookie consent plugin cookies is used to store the user may receive! Considered as part of the PD & E study is the second phase the. Are public records Florida law, email addresses are public records the category `` ''... Safer, more efficient, and safety in northwest Miami No-Build ( Action... Reconfiguration of existing interchanges and new Interchange access locations were also considered as of... Date on our latest news, project updates, job opportunities and much more the goal of the... Cookie consent plugin urban development companies the Connected and Autonomous Vehicle ( CAV ) Technology video improve the to... Are being analyzed and compared against the Build alternatives during the current browser session and campaigns. Mainline Converts to Electronic toll Collection, Widen Turnpike, Minneola Interchange to US 27 and. Turnpike Homestead Extension originates in Florida City which increased connectivity and mobility in the Central Florida region a State Impact... Had a duration of 1399 days ( 3.8 years ) and was at! Visitors across websites and collect information to provide needed capacity along Floridas Turnpike is a major evacuation route for Florida...